Welcome to The Deltic Preservation Society Online Saturday, February 04 2012 @ 12:42 PM GMT  
 | Contribute |  About Us |  Join |  Our Locos |  FAQ |  Loco Hire |  Calendar |  Search |  Gallery |  Forum |  Links | 
Menu
About Us
Join
Contact Us
Where are We?
Our Locos
Sales
Tours
FAQ
Loco Hire
Calendar
Search
Gallery
Donations/Gift Aid
DPSCS
Links

Topics
Home
Volunteers (105/0)
Tulyar (10/0)
Sales News (83/0)
RHF (52/0)
Railtours (50/1)
Open Days (59/0)
Committee (36/3)
Alycidon (79/0)
News (187/0)
The Depot (23/1)

Deltic Reference
Names
Mainline 99
Past DPS Tours

Trainz Simulator UPDATED 15/01/12
Introduction
55008 - The ECML Project
The Deltic Model
Tips & Tweaks

Next Events
There are no upcoming events

User Functions
Username:

Password:

Don't have an account yet? Check the membership page for more details...


 Baby Deltic Project  



And half an hour later, with the phasing case in place and secured with a dozen or so nuts. Compare this picture with photo 97 from earlier in the gallery to see the progress to date. Add to the visible progress about 40 hours of unseen work and the scale of the project becomes clearer.
Powered by Gallery v1.4.1-pl1
Created this page in 0.56 seconds


 Copyright © 2012 The Deltic Preservation Society Limited
 All trademarks and copyrights on this page are owned by their respective owners.

Powered By Losource