Depot Report From Sunday 6th February 2022

No.8s Cab – Work continued in the main cab with the rest of the bulkhead painted in the NSE Dark Grey, including the cover for the steam pressure/boiler unit. Painting was also done in the engine room with the remainder painted in the Executive Light Grey.



The window wipers and mechanisms were refitted to the cab along with the cab heater switch panel, engine start & stop button panel as well as the fault light panel all on the Driver’s side.



Depot – Work continued with painting of the work benches with the last of the legs finished along with a couple of touch ups here and there.



A small vice that was also acquired was degreased and rubbed down before been given a new coat of paint. Other work saw the sales stock sorted for the Doncaster Model Show on Saturday 12th and Sunday 13th February.