55009 - Work saw some touching up of paint on the bogies whilst 2/4 fuel tanks were given a new coat of paint.




There was work and assembly of the Load Regulator and Various Contactors were connected. D9015 - Work on PU538 saw more areas undercoated and painted.


PU417’s Generator was placed onto the splitting stand ready for the generator swap.


Inside No1 and No2 ends saw pipe work undercoated pre-painting.



On the cooler groups saw fitting of new Nuts, Bolts and Washers to the hatches.