
Depot report 28/6/25
- nigeljulian
- Jun 29
- 1 min read
Depot Report 28/6/25
A scorching summer day at Barrow Hill saw 7 volunteers undertaking a variety of tasks.
55009 is receiving some attention after returning from the gala events. An oil leak on the load regulator at #1 end has been rectified and the unit is now being rebuilt after a thorough clean. The fuel filters on PU 408 were replaced.
On Tulyar, the bodyside panel on #2 end was test fitted

after a speedo cable conduit has been fabricated. The repaired air pipes on the buffer beam were painted and the paint in that area was touched up.
Finally on 15, the new cab floor was fitted to #1 cab. Photos to follow next week.









Comments