top of page
DPS Logo
  • Facebook
  • Instagram
  • Twitter
Search

Depot report 28/6/25

Depot Report 28/6/25

A scorching summer day at Barrow Hill saw 7 volunteers undertaking a variety of tasks.

55009 is receiving some attention after returning from the gala events. An oil leak on the load regulator at #1 end has been rectified and the unit is now being rebuilt after a thorough clean. The fuel filters on PU 408 were replaced.

On Tulyar, the bodyside panel on #2 end was test fitted

ree

after a speedo cable conduit has been fabricated. The repaired air pipes on the buffer beam were painted and the paint in that area was touched up.

Finally on 15, the new cab floor was fitted to #1 cab. Photos to follow next week.

ree
ree
ree

 
 
 

Recent Posts

See All
55009 on the Dean Forest.

An outstanding video from our colleagues at Hellfire TV just landed on YouTube. Turn the volume up and enjoy 55009 shattering the peace of the Dean Forest at the diesel gala last September. There’s al

 
 
 

Comments


bottom of page