top of page
DPS Logo
  • Facebook
  • Instagram
  • Twitter
Search

DEPOT GCR REPORT for Monday 24th March


A couple of volunteers spent today at Loughborough giving 55019 an “A” Exam and checking everything over in preparation for the GCR giving the loco an “FTR” ( Fitness To Run ) check prior to the Reunification Weekend on 5/6th April. No issues found.

FTR checks are a requirement before a loco can run and are valid for 7 days.

“Onslaught” enjoyed watching us while sunbathing.


Report and pictures by Nigel Julian



 
 
 

Recent Posts

See All
D9015 Tulyar.

We are getting close to the point where D9015 Tulyar is ready for its big “return to service” exam, after which it will enter a period of testing to accumulate some miles and iron out whatever teethin

 
 
 

Comments


bottom of page