top of page
DPS Logo
  • Facebook
  • Instagram
  • Twitter
Search

Wednesday 30th September 2026

Sep 30
1 min read

Today at the depot 2 phasing cases were picked up by Spectrum Freight, Chesterfield, to be transported to NDE Clarke-Pitchline, Coventry, for refurbishment.



Phasing Case from engine 415 which will be used as a source of spares with a view to rebuild it as a training exercise.



Phasing Case from engine 451 which failed at the Nene Valley Railway in 2025, needing a replacement of the main shaft, seen here, flat on the lorry bed.

Also, three cases of spares went with the load.

 
 
 

Recent Posts

See All
December at the SVR

The DPS in conjunction with the SVR are delighted to announce that 55009 Alycidon will be appearing at their Diesel Running Day on Tuesday 29th December. Timetables and ticketing details will be annou

 
 
 

1 Comment


I enjoyed this depot update, especially the careful refurbishment of the phasing cases and spare parts. After reading posts like this, I often play Subway Surfers which gives me a fast, fun break.

Like
bottom of page